EPC PROJECT REFERENCE LIST
Projects
|
Client
|
Location
|
Year
|
Truck Feeding to pre concentration
|
Gol-e-Gohar (GEG)
|
Sirjan
|
2021
|
Screen Bypass of Pelletizing No. 1
|
Gol-e-Gohar (GEG)
|
Sirjan
|
2021
|
Pre-Concentration Plant
|
Gol-e-Gohar (GEG)
|
Sirjan
|
2020
|
Diesel Emergency Water Pump for Steelmaking
|
HOSCO
|
Hormozgan
|
2019
|
Ferroalloy Material Handling for SABA Steel Making
|
Mobarakeh Steel Co. (MSC)
|
Isfahan
|
2018
|
Material Handling for Pelletizing Plant
|
Khorasan Steel Co. (KSC)
|
Neyshabur
|
2018
|
Renovation of Dust Collection System
|
Gol-e-Gohar (GEG)
|
Sirjan
|
2018
|
Electro filter (ESP) for Flash furnace and Convertor
|
Canymes (NICICO)
|
Khatounabad
|
2017
|
Zinc Concentrate Production by BZS Method
|
Calsimin Co.
|
Zanjan
|
2016
|
Fire Alarm and Fire Fighting System for DR Plant
|
Mobarakeh Steel Co. (MSC)
|
Isfahan
|
2013
|
Lime Plant at Foolad Sang, 2x400 tpd (+MHS)
|
Mobarakeh Steel Co. (MSC).
|
Isfahan
|
2012
|
Pelletizing Plant No. 2, 5 Mtpy (+MHS)
|
Gol-e-Gohar (GEG)
|
Sirjan
|
2012
|
New DRI and Steel Making Electrical Room
|
Mobarakeh Steel Co. (MSC).
|
Isfahan
|
2012
|
|
Tags: Engineering, EPC , Esfahan , Esfahan Refinery, Petroleum, Administrative , Administrative Buildings, Laboratory , Terminal , Optimization of Rey Oil Storage, NIOPDC, IOTC